  1. Who is responsible for the correct erection of scaffolding?
    (a) Carpenter
    (b) General
    (c) Labourer
    (d) Sheetmetal worker
    (a) Carpenter
  2. What are gutters nailed to when roofing?
    (a) Wallboard
    (b) Fascia
    (c) Flashing
    (d) Siding
    (b) Fascia
  3. What is "Flashback" when welding oxygen and acetylene?
    (a) A Fire
    (b) A Pop
    (c) An Explosion
    (d) A Flickering Light
    (c) An Explosion
  4. When doing a take off drawing, what materials should be orderd first?
    (a) Ductwork, fittings, accessories
    (b) Accessories, ductwork, fittings
    (c) Fittings, accessories, ductwork
    (d) Fittings, ductwork, accessories
    (a) Ductwork, fittings, accessories
  5. What is the allowance of a 5/8" groove seam?
    (a) 1 1/4"
    (b) 1 7/8"
    (c) 1 5/16"
    (d) 2 1/8"
    (b) 1 7/8"

    3x5/8" = 1 7/8"
Author:
saintjames7
ID:
133611
Card Set:
Sheetmetal C of Q
Updated:
2012-02-08 02:00:37
Tags:
Sheetmetal
Folders:

Description:
Sheetmetal C of Q Prep Questions
Show Answers: