AM1 STUDY NAMP CH9

Card Set Information

Author:
fishphinfan
ID:
194713
Filename:
AM1 STUDY NAMP CH9
Updated:
2013-01-23 14:02:02
Tags:
AM1 STUDY CH9
Folders:

Description:
AM1 STUDY NAMP CH9
Show Answers:

Home > Flashcards > Print Preview

The flashcards below were created by user fishphinfan on FreezingBlue Flashcards. What would you like to do?


  1. THE MAJOR RESPONSIBILITY OF WHAT IS TO PROVIDE MATERIAL IN SUPPORT OF THE OPERATION AND MAINTENANCE  OF AERONAUTICAL EQUIPMENT?
    NAVY SUPPLY SYSTEM
  2. WHAT ASSIGNS A FORCE ACTIVITY DESIGNATOR (FAD) TO ALL ACTICVITIES IN THE NAVY ESTABLISHMENT FOR DETERMINING PRIORITIES FOR MATERIAL SUPPORT?
    UNIFORM MATERIAL MOVEMENT AND ISSUE PRIORTY SYSTEM
  3. WHAT INVOLVES A DIRECT RELATIONSHIP BETWEEN THE TWO COMPLEX OPERATIONS OF MAINTENANCE AND SUPPLY?
    MATERIAL MANAGEMENT
  4. A MEETING WILL BE HELD AT LEAST HOW OFTEN BETWEEN SUPPLY, O-LEVEL, AND I-LEVEL MAINTENANCE REPRESENTATIVES, AND UNIT QA NAMDRP PERSONNEL TO DISCUSS NMCS, PMCS, EI/PQDR EXHIBITS, AND OTHER HIGH PRORITY RELATED REQUIREMENTS?
    WEEKLY
  5. WHAT IS CHARGED FOR THE RFI REPLACEMENT OF A NON-RFI ASSET THAT IS BCM'D AND RETURNED TO THE WHOLESALE SUPPLY SYSTEM?
    NET PRICE
  6. WHAT IS CHARGED FOR ISSUES WHEN THE REQUISITIONER DOES NOT MAKE A TURN-IN?
    STANDARD PRICE
  7. WEAPON SYSTEM COSTING IS ACCOMPLISHED AT WHAT?
    NAVICP
  8. WHAT IS A PROCEDURE WHERE ALL SUPPLY ACTION DOCUMENTS IN SUPPORT OF MAINTENANCE ARE ENTERED AND MERGED WITH THE MATERIAL REPORTING HISTORY FILE FOR REPORTING TO COMNAVAIRSYSCOM?
    MATERIAL REPORTING
  9. MATERIAL REPORTING DATA WILL BE VALIDATED AND SUBMITTED TO THE LOCAL NDCSC WITHIN WHAT TIME FRAME AFTER THE SUPPLY TRANSACTION IS COMPLETED?
    1 WORK DAY
  10. WHAT SYSTEM IS THE AUTHORIZED MEDIUM FOR DIRECTING THE ACCOMPLISHMENT AND RECORDING OF MODIFICATIONS AND ONE-TIME INSPECTIONS OF EQUIPMENT?
    TDSA
  11. WHAT PROMULGATES POLICY AND PROCEDURES FOR THE MANAGEMENT OF AIRCRAFT TIRES AND TUBES?
    NAVAIR 04-10-506
  12. WHAT PROVIDES FOR INSTANCES WHERE REMOVAL OF A FAILED AIRCRAFT COMPONENT IS NOT FEASIBLE OR ADVISABLE PRIOR TO RECEIPT OF THE REPLACEMENT COMPONENT; THEREFORE, QUALIFIES AS AN ITEM TO BE RETAINED IN PLACE?
    NAVICP CRIPL
  13. WHAT IS A DETAILED STATEMENT OF AN I-LEVEL REPAIR FACILITY'S COMPONENT REPAIR CAPABILITY?
    INDIVIDUAL COMPONENT REPAIR LIST (ICRL)
  14. WHAT CONTAINS HIGH USAGE, MAINTENANCE RELATED CONSUMABLE MATERIALS, WHICH HAVE BEEN EXPENDED FROM THE SUPPLY DEPARTMENT STOCK RECORDS AND FINANCIAL ACCOUNTS?
    PRE-EXPENDABLE BIN UNIT
  15. TOTAL AVERAGE TURN AROUND TIME WILL BE LIMITED TO A MAXIMUM OR HOW MANY DAYS FOR EACH NIIN IN EACH CASE?
    20 DAYS
  16. WHAT ITEMS ARE THOSE ORDERED FOR A SPECIFIC CUSTOMER JOB ORDER AND IN THE QUANTITIES REQUIRED FOR SCHEDULED WORK BASED ON A BILL OF MATERIAL?
    DIRECT MATERIAL INVENTORY ITEMS

What would you like to do?

Home > Flashcards > Print Preview