  1. Which of the following is an advantage of the waterfall methodology of software development over the prototyping methodology?
    a) Smaller design time frame
    b) Greater user input during the design phase
    c) Longest testing time frame
    d) All user requirements are defined at the beginning of the project
    All user requirements are defined at the beginning of the project
  2. Which of the following is an advantage of the ABC methodology of software development over the waterfall methodology?

    It starts with a baseline system
  3. Smith Corp has numerous customers