2W051O Vol 1

Card Set Information

2W051O Vol 1
2013-10-06 18:59:28
2W051O Vol

2W051O Vol 1
Show Answers:

  1. When using a drill, the first thing you do is
    Make sure the diameter of the hole to be drilled is within the capacity of the drill.
  2. Which diameter (in inches) electric saw blade is the most common found in maintenance activities?
  3. An electric saw's blade must be operating at what speed before it contacts the material being cut?
  4. ow many pounds per square inch (psi) of clean, dry air are required at the tool end of the air hose to ensure safe and efficient operation of the tool?
  5. Which pneumatic impact tool is designed for installing or removing nuts and bolts?
  6. At what variation in pounds of pressure, while using an impact wrench, can the excess pressure become serious?
  7. What is the most common type of sling used in your everyday job?
    Wire rope
  8. Hoist hooks must be replaced when they have more than
    15% in excess of normal throat opening or more than 10 degrees twist from the plane
  9. The common practice that applies to any meter is always....
    verify that power is off when connecting the meter
  10. Which meter is a four-wire Kelvin digital ohmmeter used for testing AIM-9 and the AIM-120 missile system?
    AMTEC 620
  11. Which tester is a stable precision instrument designed primarily for the testing of solid-fuel rocket motor igniter bridge wire circuitry?
  12. The maximum load capacity of the MHU-141
  13. The steering system on the MHU-141
    200 inches
  14. When the MHU-141 trailer is loaded or towed with the hinged deck open, what must be done?
    The two deck-panel supports must be properly positioned and locked in place with quick-release pins.
  15. The parking brake on the MHU-110 trailer affects how many wheels?
    Four inboard rear wheels.
  16. What is the maximum capacity of a pair of rail extender assemblies used with the MHU-110
  17. How many trolley and chock assemblies are supplied with the MHU-110M?
    20 trolleys and 40 chocks.
  18. What is the maximum load capacity of the MHU-226 trailer?
  19. How many openings are on the deck of the MHU-226 trailer?
  20. What ensures the smooth transfer of HCU-6 E pallets from a rollerized trailer to an aircraft/K-loader?
    An adjustable ramp.
  21. The moving of munitions and weapons from one base to another, depot to base, or base to depot is called...
    Logistical movement
  22. Movement to support on-base operations to or from the flight line is called.....
    operational movement
  23. Which lift truck has a manually extendible wheelbase?
    MHU-83-series bomb-lift truck.
  24. The purpose of the transport beam beneath the lift arm assemblies on the MJ-1-series lift truck is to
    Provide added support and to relieve excess hydraulic pressure from the lift arms in carrying loads for long distances.
  25. Which lift truck has cantilever lift arms?
    MJ-1-series aerial stores lift truck.
  26. What is the lifting capacity of the MJ-1?
  27. When using MJ-1 lift truck extension lift arms, you immediately.....
    reduce its lifting capacity by 800 pounds.
  28. What is the lifting capacity of the MHU-83-series lift truck?
  29. When using the MHU-83B with fork adapters, you immediately....
    reduce its lifting capability by 1,000 pounds.
  30. When releasing the accelerator pedal on a vehicle driven with a hydrostatic transmission, the...
    unit coasts to a stop very quickly.
  31. What is the drawback to using the hydraulic hand pump to build hydraulic pressure on the MHU-83 B-E?
    Extremely slow way to build hydraulic pressure.
  32. What are the minimum and maximum frame-width adjustments of the MHU-83 BE?
    70 inches; 140 inches.
  33. How do you adjust the yaw on the MHU-83 B-E?
  34. What is the rated capacity of air per minute needed for the MC-7 air compressor to discharge 100 psi of pressure?
    125 cubic feet.
  35. The MC-7 air compressor is designed for
    General Maintenance
  36. The diesel model of the MC-7 air compressor is capable of operating up to how many hours at a time without refueling?
  37. What is the primary difference between a bobtail and a pickup?
    The bobtail's back end is shortened by about one-half.
  38. The unique and handy feature of the bobtail truck's center pintle hook is that it can be unpinned and...
    moved in, out, or sideways for ease of trailer hookup.
  39. The maximum towing speed of the bobtail while towing equipment is
  40. Which AF form is used to document a daily inspection on a general cargo truck?
  41. What is the purpose behind good operator maintenance of all assigned vehicles?
    Maintain vehicle serviceability at reduced cost.
  42. What is the maximum tow capacity of the MB-4 aircraft towing tractor?
  43. Which position should the differential shift lever be in while driving the MB-4 towing tractor on dry road surfaces?
  44. What range should be selected in a tractor with an automatic transmission while going down grades?
    low range
  45. Which procedure is not a consideration for backing a tractor trailer combination?
    Turn toward the passenger's side.
  46. what is the maximum depth of water you may drive a rough-terrain forklift through?
  47. Which forklift has the solid front axle and pivot pin that allows the front end to pivot when turning the steering wheel, making it very dangerous when climbing in or out?
    Adverser-terrain forklift
  48. what is the maximum reach of the variable-reach forklift with the forks elevated at 45 degrees?
    15 ft
  49. which type of forklift has a "deam-man" that can be operated from the driving position?
  50. when can you store powered equipment in a building with explosives?
    Only when stored in fire-resistive buildings and such equipment is essential to day-to-day operations
  51. Which ammunition loading system services the M61A gun system?
    Linkless ammunition loading system (LALS)
  52. which component is not one of the 5 weapons assemblies?
    Ammunition Drum
  53. Which technical order (TO) covers the LALS?
    TO 35D2-19-1.
  54. Which weapons replaceable assembly receives ammunition from three bays of the container assembly and merges them into a single stream?
    Transfer Unit
  55. Which weapons replaceable assembly consists of the flex drive assembly?
  56. Which component transfers rounds into the aircraft gun feed system?
    Universal aircraft interface unit.
  57. What is the maximum number of rounds the universal ammunition loading system (UALS) drum can hold?
  58. Which subassembly of the universal ammunition loading system (UALS) houses a remaining indicator window that provides the means to visually determine the approximate number of rounds in the unit?
    outer drum
  59. Which subassembly of the universal ammunition loading system (UALS) provides the means to load live rounds into the aircraft gun system?
    Interface unit
  60. Which of the following is not counted by the three counters on the interface unit of the universal ammunition loading system (UALS) record during load download operations?
    Damaged rounds downloaded.
  61. What is the inspection cycle for the universal ammunition loading system (UALS) replenisher?
    Every 30 days when in use and annually when in storage
  62. What tool can initiate cycling ammunition through the universal ammunition loading system (UALS) replenisher manually?
    ½-inch speed wrench.
  63. What happens to the unfired rounds returning from the loader during the processing of linked ammunition?
    Automatically downloaded through the second gate in the bottom of the replenisher.
  64. Which 30mm cannon is internally mounted in the A-10 aircraft?
  65. During in-shop maintenance, 30 mm ammunition loading assembly power comes from the
  66. Which 30 mm ammunition loading system is used to service the GPU-5A gun pod?
  67. How many MHU-110M trailers are needed to transport one AE32K-3 munitions assembly conveyor (MAC)?
  68. Which component of the AE32K-3 munitions assembly conveyor (MAC) can be used as a forklift adapter to raise the gantry to full height?
    Interface control board (ICB).
  69. What is the weight capacity of the air-driven hoist attached to each gantry of the AE32K-3 munitions assembly conveyor (MAC)?
  70. The triple bomb bar is fitted with bomb slings and is used with each hoist to provide for lifting
    500-pound munitions at a time or two 2,000-pound munitions items.
  71. Which technical order (TO) covers the rapid-assembly and inspection procedures of nonnuclear munitions?
  72. Why is it important to monitor net explosive weight (NEW) during a bomb buildup operation?
    If iginited, excessive NEW may cause propagation of an explosive from another location
  73. When packing up the munitions assembly conveyor(MAC) why is it important to cap the ends of the air hoses?
    To keep foreign materials from damaging them
  74. Which component of the munitions assembly conveyor(MAC) is disassembled last?
  75. What does not apply to munitions and explosives in the transportation mode?
    Quantity distance (QD) criteria.
  76. What is the requirement for operators of vehicles and equipment used in transporting and handling explosives?
    Must be trained and under the supervision of an individual who understands the hazards and risks involved.
  77. When is it permissible to transport explosives in privately owned vehicles (POV)?
  78. which publication is used in addition to the Joint Hazard Classification System to determine the explosive hazard class and division of a specific munitions item?
    TO 11A-1-46
  79. Which publication provides information on the correct positioning of munitions and tie-down procedures?
    TO 11-1-38
  80. what type of information is given in the general notes on the first card of each trailer and weapon-type section in TO 11-1-38 and is required to be reviewed?
    WARNINGS, CAUTIONS, and NOTES pertaining to each trailer and weapon
  81. What type of information is not presented on the load matrix cards in TO 11-1-38?
    Safety and accident prevention procedures.
  82. The CGU-1B tie-down assembly has a rated working load capacity of
  83. if you cannot close the load-binder by hand,
    adjust the load-binder hooks on the chain
  84. When loading munitions on the MHU-110/M trailer, always load the...
    Front first and unload it last
  85. What piece of equipment MUST be used with the MHU-110/M to prevent the trailer from becoming unstable while loading or unloading?
    Stabilizer jack
  86. What provides an itemized list of all equipment authorized for use with nuclear weapons?
    Master Nuclear Certification List (MNCL)
  87. How are items identified as being nuclear certified?
    Positive identification by a nameplate, label, appropriate markings, or by official documents
  88. Which statement about pintle hooks and their use in operations with nuclear weapons IS NOT correct?
    Original equipment pintle hook assemblies are not authorized
  89. Which equipment DOES NOT require nuclear safety certification before being used in operations with nuclear weapons?
    General-purpose hand tools
  90. Use the cable-type load binder to secure...
    Unbolstered weapons on the MHU-141/M trailer
  91. After final tightening of the cable-type load binder, verify...
    threads (more than one) are exposed inside the turnbuckle
  92. How many CGU-1/B straps are you authorized to use for one MB-1 tie-down assembly?
  93. How do you extend the CGU-1-B strap?
    Release the adjusting mechanism; pull the strap
  94. How many miles can a "maneuverable" bolster be towed over hard surfaces before a "bare hand" test of the casters is required?
  95. If a container is rated "roadable," you can tow it at speeds up to...
    20mph over primary roads
  96. What does the Department of Defense (DOD) use as the normal mode of transportation during a logistical movement of nuclear weapons?
    Air or truck
  97. How often are couriers certified?
  98. What code word is used when a Department of Energy (DOE) convoy seeks sanctuary during an emergency?
    Safe Haven
  99. What IMT is used to transfer custody of missile warheads?
    AF IMT 514