  1. Neighborhood homeowners are meeting with the school board to discuss sharing some of a new school's facilities. How many shared-use spaces must a school provide for Joint Use of Facilities?
    3
  2. An apartment complex is being built in a suburban area on a greenfield site. The site has an existing imperviousness of 25%. The pre-development discharge volume of stormwater is 8,000 gallons. What can the maximum post-development discharge volume be to qualify for Sustainable Sites Credit, Stormwater Design-Quantity Control?
    Equal to pre-development discharge (8000 gallons)
  3. The two primary responsibilities of the U.S. Green Building Council (USGBC) are:
    to develop the LEED Green Building Rating System & Develop and provide LEED based education and research projects
  4. A project building on a previously undeveloped site has no setback and will have no open space around the building. Can this project earn a Sustainable Sites Credit, Site Development-Protect or Restore Habitat?
    no
  5. A major renovation of a 30,000 sq. ft. dormitory on a college campus will include removing fill dirt and contouring the land to prevent water damage to the building foundation. What is required to achieve Sustainable Sites Prerequisite, Construction Activity Pollution Prevention?
    Confirmation that the project complies with NPDES or local regulations if more stringent
  6. A project team is working on a private school in a dense neighborhood averaging 65,000 SF/acre. The project team wants to earn a point for community connectivity. There are three highways nearby. Can the school count itself as a basic service in the calculation?
    No, a project cannot consider itself a service
  7. What rule/regulation defines external lighting zones?
    IESNA RP-33
  8. A new manufacturing building will have employees that work on one of three non-overlapping shifts. No local zoning exists for parking. How would you calculate parking requirements for SS Credit 4.4 Alternative Transportation: Parking Capacity?
    Use FTE of largest shift
  9. A project building is located in a high density residential area classified as LZ3: Medium. What mustoccur for the building's exterior lighting to earn Sustainable Sites Credit: Light Pollution Reduction?
    Document that no more than 5% of the total initial designed fixture lumens are emitted at an angle of 90 degrees or higher from nadir
  10. What site would meet the minimum distance requirements to comply with the U.S. Code of Federal Regulations 40 CFR?
    Land 100 ft. from any wetland
  11. Which interior and site areas require light pollution control for SS Credit 8 Light Pollution Reduction?
    Building facade power density, Interior office lights, and overhead parking lighting
  12. A new surface parking lot is being planned for a shopping center that will be constructed on a Greenfield site. What amount of site disturbance beyond the parking area can earn Sustainable Sites Credit, Site Development-Protect or Restore Habitat?
    10ft
  13. For a site to be considered a Brownfield site, what type of information does the project team need?
    Declaration from the EPA office or from state agency
  14. The low-sloped roof of an office building will be approximately 30,000 sq. ft. What strategy will achieve SS Credit 7.2 Heat Island Effect: Roof?
    • 15,000 sq. ft. vegetated roof,
    • 22,500 sq. ft. roof surface of SRI 78,
    • 12,000 sq. ft. roof surface of SRI 78 plus 7,000 sq. ft. vegetated roof
  15. Sites seeking the Development Density credit must achieve these 2 requirements:
    A previously developed site and A site in a community with a minimum density of 60,000 sf per acre net
  16. During an early design review a project team has decided to consolidate the building footprint and add underground parking. These changes can help contribute to earning which credits/prerequisites?
    SS Credit 7.1, Heat Island Effect: Non-Roof or SS Credit 6.1, Stormwater Design: Quantity Control
  17. LEED project for a retail development has been denied credit for SS Credit 7.1 Heat Island Effect: Non Roof. The project anticipated earning the credit by having 50% of the parking spaces under deck. What can the project team do to correct the problem?
    Cover the deck with a material with an SRI of 29
  18. How close does a building's entrance need to be to a rail station or bus stop to qualify for Sustainable Sites Credit, Alternative Transportation-Public Transportation Access?
    1/4 mile walking distance from 1 or more stops for 2 or more bus lines or 1/2 mile walking distance from 1 commuter rail, light rail, or subway station
  19. A project is being built on a 6 acre greenfield site. A civil engineer has determined the existing imperviousness of the site is 25%. The project team would like to qualify for SS Credit 6.1 Stormwater Design. What are the options to qualify for this point?
    • Implement a stream channel protection strategy with quantity control and Ensure post-development peak discharge is less than or equal to pre-development peak
    • discharge
  20. A technology firm is deciding on a location to build a new data center. Which of the following sites would be most appropriate to build on?
    Developed site located 30 feet from a fishing stream
  21. What type of water has the highest quality?
    Waste water
  22. Which of these fixtures are examples of process water use? [Choose three]
    • Boiler and chillers
    • Dishwashers
    • Ice making
  23. A rainwater harvesting system can help with:
    Water efficiency
  24. Which two of the following are considered sources of potable water in LEED? [Choose two]
    • Irrigation wells
    • Municipal water system
  25. The goals of the Water Efficiency credits are to: [Choose two]
    • Reduce the quantity of potable water needed for buildings and landscaping
    • Reduce the burden on municipal wastewater treatment facilities
  26. What flush rate is established as the baseline water consumption for water closets?
    1.6 gallons per flush
  27. Graywater is most often used for:
    Landscape Irrigation
  28. The EPAct 1992 water standard excludes which types of fixtures and equipment?
    Dishwashers
  29. Wastewater from kitchen sinks can:
    Sometimes be recycled and used for irrigation, depending on local codes
  30. Graywater can come from which of the following sources? [Choose three]
    • Bathtubs
    • Laundry tubs
    • Showers
  31. Landscape designs that aim to eliminate the need for irrigation are called:
    Xeriscape
  32. Increasing the use of graywater in a building can help with:
    Reducing potable water use by urinals
  33. What standard for fixture performance must be used to calculate the Baseline Case for Water Use Reduction credits?
    EPAct (page 168)
  34. According to WE credit 2: Innovative Wastewater Technologies, to what standard must water from toilets and urinals be treated in order to be infiltrated back into the earth?
    Tertiary standards
  35. LEED projects cover a wide range building types and users. How does LEED define transient? (Choose 2)
    • Students
    • Retail customers
  36. In WE Credit 1, Water-Efficient Landscaping, the evapotranspiration rate for July is used for calculations due to the higher irrigation demands in this month. What is the evapotranspiration rate a measure of?
    The amount of water lost from a vegetated surface in units of water depth
  37. When calculating the baseline water use for Water Use Reduction credits, new construction projects should use what flow rate for public lavatories?
    0.5 gallon per minute
  38. Which of the following could help projects to achieve Water Use Reduction credits? [Choose two]
    • Installing Low Flow Toilets
    • Using rain/graywater for toilet flushing
  39. Which of the following does NOT help achieve a water-efficient landscape?
    Overhead sprinklers
  40. Name 3 things that can contribute to a water efficient landscape
    • Perennials
    • Adaptive plantings
    • Installing hardscapes
  41. An owner has changed the landscaping design for a project from non-native plants and lawn to a Xeriscape. The original plan called for rainwater collection from the building's roof into salvaged cisterns to supply water for the landscaping only. The cisterns will be removed from the design. Which credits could be affected by this decision? [Choose two]
    • Sustainable Sites Credit 6.2, Stormwater Design-Quality Control
    • Water Efficiency Credit 1, Water-Efficient Landscaping
  42. To eliminate the use of refrigerants for HVAC systems in new projects, the strategy would be?
    Design a natural (passive) ventilation system
  43. What type of energy system cannot earn EA Credit 2, On-Site Renewable Energy?
    Geo-exchange system
  44. A project team has not been able to perform an energy simulation for Energy and Atmosphere Credit, Optimize Energy Performance. For Energy and Atmosphere Credit 2, On-Site Renewable Energy, where can the project team find information to determine the energy cost supplied by the renewable energy systems?
    Commercial Buildings Energy Consumption Survey
  45. Which systems will contribute to earning Energy and Atmosphere Credit 2, On-Site Renewable Energy? (2)
    • Photovoltaic system
    • Bio-fuel system that uses animal waste
  46. Which standard will be used to demonstrate a 10% improvement in the proposed building performance rating for a new building?
    ASHRAE 90.1-2007
  47. What party does not qualify for CxA if the project team wants to meet the requirements of Energy and Atmosphere Credit 3: Enhanced Commissioning?
    Disinterested employee of architect or engineer
  48. When building a 25,000 sq. ft. office building, what standard is used when taking prescriptive measures for Energy and Atmosphere Credit 1, Optimize Energy Performance?
    Advanced Buildings Core Performance Guide
  49. A popular program for comparing the energy performance of multiple buildings:
    ENERGY STAR
  50. Which refrigerant has the lowest Ozone Depletion Potential (ODP)?
    HFC
  51. What renewable energy systems are not eligible for Energy and Atmosphere Credit 2, On-Site Renewable Energy?
    Passive solar architectural features
  52. What is the major consideration when developing a sustainable project budget?
    Life cycle costs
  53. In the LEED charrette the team is discussing Energy and Atmosphere Credit, Optimize Energy Performance and what strategies might help earn that credit. The project type is a one-story office building. What is a design decision that has the greatest impact toward achieving this credit?
    The building orientation
  54. A new suburban retail project will be implemented using a bio-fuel based electrical system. Which biofuels are excluded from eligibility for Energy and Atmosphere Credit, On-Site Renewable Energy?
    Forestry biomass waste, other than mill residue
  55. What criteria are not used to determine what prescriptive measures must be followed when using the ASHRAE Advanced Energy Design Guide to calculate minimum energy performance?
    Number of stories
  56. Energy and Atmosphere Credit 3: Enhanced Commissioning comes with an exemplary performance option. A new construction retail building can achieve the extra point by completing what action?
    Comprehensive envelope commissioning
  57. A core and shell project in Nevada has a wind energy system added to the roof. According to the US DOE's Commercial Buildings Energy Consumption Survey the estimated electricity the project will use will be 100,000 kWh/year. Energy costs in the area are $8.15/kWh. How much energy must the wind system produce to earn 4 points for EA Credit 2, On-Site Renewable Energy?
    $8,150
  58. Implementing a CFC refrigerant phase out plan for a building which is connected to an existing chiller system requires what to be done?
    Reduce annual leakage of CFC based refrigerants to be 5% or less
  59. Regarding refrigerant management what kind of ODP value should a refrigerant have?
    Small
  60. The project team is discussing commissioning activities in a pre-design meeting to help determine a target certification. What additional tasks will the commissioning authority need to perform for enhanced commissioning?
    Conduct a design review prior to producing mid-construction documents
  61. A CxA has been selected to perform the fundamental commissioning of a new computer data center. Which of the following must the CxA commission for LEED certification?
    Renewable energy systems
  62. Which EA credit has the most possible points?
    EA Credit 1: Optimize Energy Performance
  63. LEED:
    Leadership in Energy and Environmental Design
  64. USGBC:
    U.S. Green Building Council
  65. GHG:
    Greenhouse Gas
  66. HVAC:
    heating, ventilation, and air conditioning
  67. ASHRAE:
    American Society of Heating, Refrigerating and Air-Conditioning Engineers
  68. CxA:
    Commissioning Authority
  69. BoD:
    Basis of Design
  70. EPA:
    Environmental Protection Agency
  71. CFC:
    Chlorofluorocarbon
  72. REC:
    Renewable energy certificates
  73. A city has mandated all new government buildings earn at least LEED silver. A LEED consultant has been brought in with the project team on a new high school. Which of the following is not required for LEED certification of this project?
    Mold Prevention
  74. In MR Credit 2 Construction Waste Management, which two materials are not to be included in calculations for construction and demolition waste diversion (Choose 2)
    • Excavated soil
    • Hazardous materials
  75. A 10,000 sq. ft. building is undergoing major renovation and expansion. The expansion will add an additional 15,000 sq. ft. to the existing building. To achieve MR Credit Materials and Resources Credit, Building Reuse-Maintain Existing Walls, Floors, and Roof, what existing surface area information is not needed to document compliance with this credit?
    Suspended ceilings
  76. Furniture may be included in all except the following two Material credit calculations, but if used, must be used consistently on all of them (Choose 2)
    • MRc1, Building Reuse
    • MRc2, Construction Waste Management
  77. In a condominium project what requirements must be met for ETS control if the hallways and rooms have the same air pressure?
    Weatherstrip all doors leading to common hallways and seal vertical chases adjacent to the units
  78. Name 2 products which are unlikely to qualify as products including rapidly renewable materials, as defined by MRc6?
    • E) eart pine
    • Particle Board
  79. An office project will have space for a combined 100 workstations and private offices, and 5 conference rooms. What spaces must have lighting controls for Controllability of Systems - Lighting?
    All conference rooms and 90 of the total workstations/private offices
  80. The project team is working on the project specifications for a new school. Which products are not considered a composite wood for Indoor Environmental Quality Credit, Low-Emitting Materials-Composite Wood and Agrifiber Products?
    MDF conference room tables
  81. For a new construction project, which Materials & Resources credit does not provide the opportunity for Exemplary Performance credits in the Innovation & Design Process category?
    MRc1, Building Reuse
  82. The new addition to a school will not be completed before the new school year begins. Renovations will continue while school is in session, including the installation of VOC-emitting materials during some mild sunny weather. What should the contractor do to prevent the contamination of the occupied school?
    Ventilate using 100% outside air
  83. Which of the following standards does MRc4, Recycled Content, reference?
    ISO 14021 – 1999 – Environmental Labels and Declarations
  84. A building is undergoing a major renovation and expansion. The addition is 1.5 times the square footage of the existing building. To achieve MR Credit 1, Building Reuse, what existing surface area information must be available to document compliance with this credit? (Choose 3)
    • Exterior skin and framing
    • Structural floor and roof decking
    • Interior finish ceiling
  85. Name 4 materials that contribute to the rapidly renewable content calculation under MR Credit 6, Rapidly Renewable Content?
    • Bamboo cabinets
    • Cork flooring
    • Rigid foam insulation with corn-derived binder
    • Straw-plastic composite decking
  86. The building materials on a DMV field office average 15% post-consumer recycled content as well as 20% pre-consumer recycled content. How many points under MR Credit 4 Recycled Content can the project earn?
    2 points
  87. An office building in which most of the structure will be maintained is seeking LEED certification for a renovation. The general contractor on a project is working to help a project compile information to comply with MR Credit 2, Construction Waste Management. What information needs to be gathered in order to perform the credit calculations?
    Tons of mixed waste sent to landfill
  88. A counter made of recycled glass obtained and manufactured within 500 miles of project would contribute toward:
    Both regional and recycled materials
  89. An architect is discussing maintenance items with the facility operator during the charrette. Which of the following entryway systems must be maintained at least weekly to achieve Indoor Environmental Quality Credit, Indoor Chemical and Pollutant Source Control?
    Roll-out mats
  90. You are renovating and adding to a 15,000-square-foot historic building and seeking LEED certification for the resultant 50,000-square-foot building. You will reuse 95% of the existing building structure. Many of the floors, trim, and doors in the existing building are not suitable for its new use, but will be used in the addition, defraying 6% of the total materials cost. Which of the following credits would apply?
    • MR Credits 1.1, 1.2 & 1.3, Building Reuse
    • MR Credit 1.2 & 1.3, Building Reuse
    • MR Credit 1.1, Building Reuse
    • MR Credit 1.3, Building Reuse
    • None of the above
  91. A project team is designing a library to have a high level of lighting system control. What project design would meet the requirements for individual control of lighting?
    Provide individual lighting controls for 90% of the building occupants and provide lighting system controls for all shared multi-occupant spaces
  92. An office is relocating to a new facility in another state. Any furniture and furnishings that are relocated to the new site can contribute to Materials and Resources Credit, Materials Reuse if these materials were purchased:
    At least 2 years prior to the project's initiation