MK1[1].txt

Card Set Information

Author:
SaltySnipe
ID:
265380
Filename:
MK1[1].txt
Updated:
2014-03-06 18:11:45
Tags:
Mk1
Folders:
Mk1
Description:
MK1
Show Answers:

Home > Flashcards > Print Preview

The flashcards below were created by user SaltySnipe on FreezingBlue Flashcards. What would you like to do?


    • author "me"
    • tags ""
    • description "MK1 eoc"
    • fileName "MK1"
    • freezingBlueDBID -1.0
    • What chapter in the nem would you find information on inspections, records, reports, and tests?
    • 090
  1. This directive is a permanent type of instruction containing 25 or more pages? These are cancelled by originator or higher authority.
    Manual
  2. What chapter in the nem would you find information on electrical plant and safety precautions?
    300
  3. Where would you submit the original dry-docking and underwater body inspection work sheet to?
    Mlc via nesu
  4. Within how many days of an inspection are you required to submit the boat inspection report?
    10 days
  5. Where should you log the official changes issued to a directive?
    Record of changes page
  6. What form will members fill out if feedback or discrepancies are needed or found in any time compliance technical order (tcto)?
    Cg-22
  7. What is the reporting interval for the cutter engineering report?
    Every calendar year ending 31 dec
  8. Which funding will be utilized for maintenance or repairs which are expected during the normal life of the building, utility system, or equipment?
    Afc-30 funds
  9. Which casrep format data set provides amplifying information concerning all or part of a message?
    Remarks
  10. This is a directive of a one time or brief nature. Remains in effect until date of cancellation or cancelled after 1 year?
    Notice
  11. Which casrep identifies the status of the casulty, parts, and assistance requirements, whos info is essential to allow operational and staff authorities to apply resources at the proper priority?
    Initial
  12. What are four types of casreps?
    • Initial
    • Update
    • Correct
    • Cancel
  13. How long are units required to retain copies of boat inspection reports?
    Three years
  14. Which report contains data that is used to preserve the continuity of a operational history of a piece of equipment?
    Machinery history
  15. Corrective maintenance actions (cma) are used to record and update unscheduled maintenance for what two items?
    • Repairs
    • Casualties
  16. Machinery safety device deficiencies are always entered in the machinery log.
    True or false
    True
  17. Which directive prescribes policies and procedures for administering the coast guard paperwork management program?
    COMDTINST M5212.12 (series)
  18. Which cg-form can the boat inspection report be found on?
    Cg-3022
  19. What chapter in the nem would you find information on propulsion shafting?
    243
  20. What chapter in the nem would you find the machinery space watch requirements?
    044
  21. What chapter in the nem would you find information on maintenance of cutters and boats?
    081
  22. What chapter in the nem would you find information on propulsion bearings?
    244
  23. What chapter in the nem would you find information on hydraulic equipment?
    556
  24. What chapter in the nem would you find aux boilers and steam generators?
    517
  25. What chapter in the nem would you find information on condensers and heat exchangers?
    254
  26. What form number is used for an engineering change request?
    Cg-5682
  27. Which reports require entries to ensure that the unit has maintained records for demp or performance tests, bottom pain, pms completion, and boat records?
    Boat inspection reports
  28. Which report covers conducting inspections on safety items, hull, machinery, electrical, and administrative programs and recording pms completion percentages?
    Cutter engineering report
  29. For WHEC, WMEC, and WAGB class vessels, which report is required to be maintained by both the operations and engineering departments?
    Tag-out log
  30. A casualty report (casrep) should be submitted for any equipment malfunctions or deficiency that cannot be corrected with in 48 hours and affects the units ______?
    • Primary mission
    • Secondary mission
  31. Which cg-form can the SSMR (shore station maintenance record) be found on?
    Cg-4094
  32. What chapter in the nem would you use for conducting becces and find information on stability and damage control?
    079
  33. Which information set identifies the message type and message originator information on a casrep?
    MSGID
  34. Which cg-form can the underwater body paint report be found on?
    Cg-4815
  35. Which casrep is submitted when changes to a previously filed casrep are required?
    Update
  36. What chapter in the nem would you find information on compressed air systems?
    551
  37. Which priority code would be used to be accomplished as part of a normal backlog procedures (up to 5 years) when completing an ssmr?
    • Priority 3
    • * note - majority of ssmr's fit into this category
  38. What chapter in the nem would you find information on the propellers?
    245
  39. What chapter in the nem would you find information on refrigeration system requirements?
    516
  40. What chapter in the nem would you find information on potable water, evap's, and r/o?
    530
  41. Which report is submitted by the unit to identify all maintenance work beyond the capability of the unit's assigned personnel?
    Current ships maintenance project
  42. What does the coast guard use to administer the configuration management process?
    Engineering change request
  43. Which cg-form can the csmp (current ships maintenance project) be found on?
    • Cg-2920
    • Cg-2920a (continuation sheet)
  44. Which cg-form can the cutter engineering report be found on?
    Cg-4874(rev.6/04) or CMplus equivalent
  45. Pertinent identifying information about the casrep equipment item being reported on is found in the ______ information set?
    Partsid
  46. Which casualty category is specified when a deficiency exists in mission essential equipment that causes a minor degradation of any primary mission, or a major degradation or total loss of a secondary mission?
    • Casualty category 2
    • * note- casualties affecting a secondary mission shall always have a category of 2
  47. Which casualty category is specified when a deficiency exists in mission essential equipment that causes a major degradation but not the loss of a primary mission?
    Casualty category 3
  48. What are two requirements for setting up the machinery history file?
    • One form is filled out for each piece of equipment listed in the cutters mica manual
    • Forms are indexed in the same way as the mica manual
  49. When maintaining the machinery history file, what information should you include pertaining to each entry?
    • Date
    • Summary of important data
    • Operating hours
  50. What is done to a directive when 50% or more of the original text or signature page has been changed?
    Reissue
  51. Who determines the procedures for making ssmr change recommendations?
    Individual sector/group SOP's
  52. What chapter / section of the directives, publications, reports index (dpri) listing identifies the order form to use to request updates, replacements, or new directives?
    Chapter 1, section c
  53. That statment "a military communication in which policy is established or a specific action is ordered" best describes the purpose of what?
    Directive
  54. The statement of work (sow) is to measure the performance of who?
    Contractor
  55. List the typical members of a hull inspection board?
    • Mlc/nesu representative
    • Cutters co / oic
    • Cutters first lieutenant
    • Cutters eo / epo
  56. What type of equipment casualty is reported on the material casualty report?
    Significant
  57. What chapter in the nem would you find information on full power trials?
    094
  58. What chapter in the nem would you find information on shipboard aviation fuel systems?
    542
  59. Which casrep format data set identifies parts required to repair an equipment casualty?
    Iparts
  60. Which casrep format data set reports the estimated time of casualty correction and factors that might affect the estimate?
    Estimate
  61. What command is each of the fallowing reports submitted to?
    Boat inspection report
    Cutter engineering report
    Dry-docking and under water body inspection work sheet
    Underwater body paint report
    MLC
  62. Which number properly identifies the initial casrep's year and sequential order? For example intitial-05004
    • 05 calendar year
    • 004 sequential casrep number
  63. What chapter in the nem would you find the time compliance technical order?
    041
  64. Which types of projects should be entered into an ssmr (shore station maintenance program)?
    • Non-reocurring maintenance, repair, and replacement projects estimated to cost greater then $5,000
    • Storm or casualty damage sustained by structures, utilities, or equipment
    • Major equipment replacement or overhaul
    • Maintenance and repair of aid to navigation structures that cost more than $5000
    • Projects requesting engineering technical assistance or problems for which a solution is not known
  65. What chapter in the nem would you find information on internal combustion engines?
    233
  66. What chapter in the nem would you find information on gasoline handling and stowage?
    540
  67. What chapter in the nem would you find information on fuel systems for cutters and boats?
    541
  68. What chapter in the nem would you find information on safety?
    077
  69. What chapter in the nem would you find information on technical publications?
    086
  70. What chapter in the nem would you find information on coast guard naval engineering drawings?
    085
  71. What chapter in the nem would you find information on electric propulsion?
    235
  72. Which casrep is submitted when equipment identified on a casrep is scheduled to be repaired?
    • Cancel
    • * note - do not cancel outstanding casualties that will not be repaired during such availability but include them for normal follow up casualty reporting procedures
  73. Which casualty category is specified when a deficiency exists in mission essential equipment that is worse than category 3, and causes a loss of at least one primary mission?
    Casualty category 4
  74. Which types of projects should not be entered into an ssmr (shore station maintenance program)?
    • - reoccurring repairs and maintenance of shore structures and facilities
    • - equipment less than $5000
    • - purchase/replacement regardless of cost
    • - projects on boats of cutters
    • - projects not entered into a ssmr cont
    • -projects which combine smaller unit capable projects into large projects over $5000
    • - maintenance service work (lawn maintenance, housing, custodial, weight testing)
    • - electronic projects
    • - environmental cleanup or restoration projects covered by ec&r
  75. What is the reporting interval for the underwater body paint report?
    After each routine or emergency dry-dock
  76. Which priorty code would be used for early accomplishments desirable (6 months-2 years) when completing a ssmr?
    Priority 2
  77. What should be in the first line of the "description of work" block of an ssmr?
    A short project title
  78. Which priorty code would be used for immediate accomplishments for a unit to perform its mission or maintain its habitability and/or safety requirements when completing an ssmr?
    Priority 1
  79. List the submission deadlines for each of the following reports:
    Boat inspection
    Cutter engineer report
    Dry-docking and underwater body inspection work sheet
    Underwater body paint report
    • -Not later than 10 days after completion of inspection
    • - not later than January 31
    • - before third a-team meeting
  80. What chapter in the nem would you find information on lubricating oils?
    262
  81. What should the statement of work (sow) specify?
    Clear, understandable terms the work to be done in developing or producing the goods to be delivered or services to be performed by a contractor
  82. List the three types of inspections required by the boat inspection report:
    • Records inspection
    • Waterborne inspection
    • Inspection while hauled out
  83. Which types of vessels are required to maintain csmp (current ship maintenance) files?
    • - all cutters 65 feet and longer
    • - standard boat assigned to a cutter
  84. What are the four main parts of a casrep?
    • -Standard navy message header
    • - data sets identifying the type of message and location
    • - data sets identifying the type of equipment casualty and cause, and necessary support information
    • - data sets providing amplifying info or general info
  85. List the reporting intervals for each of the following reports:
    Boat inspection report
    Cutter engineering report
    Dry-dock / underwater body inspection report
    Underwater body paint report
    • -Yearly not to exceed 1 yr between inspections
    • - 1 year ending December 31
    • - after each routine or emergency dry-docking
    • - after each routine or emergency dry-docking and after each boot top paint touch up
  86. Which funding will be utilized for projects where the improvement component is $200,000 or less and less than 75% of facility is being replaced?
    Afc-43
  87. Which manual published the complete list of coast guard directives and thier required distribution?
    Directives, publications, and reports index
  88. What is the purpose of the distribution symbol?
    Code used to group units by type for the purpose of distributing directives and publications.
  89. Which casrep is submitted when equipment identified on a casrep is repaird and back in operational condition?
    Correct
  90. Which cg-form can the dry-docking and underwater body inspection work sheet be found on?
    Cg-2926
  91. What are the most common reason for making change recommendations to an existing ssmr?
    • -safety issues
    • - lack of personnel
    • - interferences (electrical wire runs, Windows, doors, structure load capacities, plumbing)
    • - missing drawings or missing parts
  92. Which casrep format data set signifies the beginning of formatted information?
    Msgid
  93. Which casrep format data set provides equipment identification information?
    Partsid
  94. Who are the four originating authorities authorize to issue directives?
    • -commandant
    • -area, district, group commanders
    • - commanders, Mlc
    • - co's, oinc's
  95. What chapter in the nem would you find information on piping?
    505
  96. At minimum what items should be included in the machinery history file?
    • - whenever a piece of equipment is altered from what is shown in the MIB
    • - ball bearing and packing size info
    • - important part numbers

What would you like to do?

Home > Flashcards > Print Preview