  1. Overall responsibility for compliance with API 653
    OWNER
  2. Evaluate deterioration on existing shell material
    ENGINEER
  3. In a corroded area, find t2 (thinnest area exclusive of pit)
    INSPECTOR
  4. In a corroded area, determine the vertical lines (L)
    INSPECTOR
  5. Perform the external inspection
    INSPECTOR
  6. Perform the Routine In-Service inspection
    Operator
  7. Determine the extent of UT measurements on the shell
    OWNER
  8. Review the results of CP Surveys
    OWNER
  9. Assure competency of personnel performing CP surveys
    OWNER
  10. Perform the internal inspection
    INSPECTOR
  11. Assure quality & completeness of in-service NDE (robotics) exams
    INSPECTOR AND NDE GURU
  12. Determine internal interval based on tank bottom corrosion
    OWNER
  13. Determine internal interval based on RBI
    OWNER
  14. Conduct RBI assessments
    RBI GURU
  15. Review and approve RBI assessments
    INSPECTOR AND ENGINEER
  16. Maintain tank records
    OWNER
  17. Review inspection findings and recommendations
    OWNER
  18. Ensure disposition of all recommended repairs and monitoring
    OWNER
  19. Evaluate and accept NDE examination results
    INSPECTOR
  20. Authorize all repairs
    INSPECTOR OR ENGINEER
  21. Authorize all alterations
    ENGINEER
  22. Designate inspection hold points for repairs, alterations & reconstructions
    INSPECTOR
  23. Provide general authorization for limited routine repairs
    INSPECTOR
  24. Approve all proposed methods of design, materials, WPSs, NDE & testing
    INSPECTOR OR ENGINEER
  25. Approve all repair, alteration and reconstruction work at hold points
    INSPECTOR OR ENGINEER
  26. Approve all repair, alteration and reconstruction work at completion of work
    INSPECTOR OR ENGINEER
  27. Review & approve the use of non-code specified lap patches on bottom
    ENGINEER
  28. Approve lap patch in critical zone if bottom thickness is less than 0.100"
    ENGINEER
  29. Run the hot tap machine
    Qualified Operator
  30. Authorize all reconstruction work
    INSPECTOR OR ENGINEER
  31. Review the use of Preheat or Controlled Deposition welding in lieu of PWHT
    ENGINEER
  32. Concur in writing the use of Deposition Welding for material of unknown toughness
    ENGINEER AND OWNER
  33. Review and Approve exempting a hydrotest after a major repair or alteration
    ENGINEER AND OWNER
  34. Authorize FFS evaluation to exempt a hydrotest after major repair or alteration
    OWNER
  35. Perform FFS evaluation to exempt a hydrotest after major repair of alteration
    ENGINEER
  36. Perform tank settlement survey
    Experienced Person