LOAD OOs

Card Set Information

Author:
KeGrant
ID:
283322
Filename:
LOAD OOs
Updated:
2014-09-17 21:53:53
Tags:
LOAD OOs
Folders:
LOAD OOs
Description:
LOAD OOs
Show Answers:

Home > Flashcards > Print Preview

The flashcards below were created by user KeGrant on FreezingBlue Flashcards. What would you like to do?


  1. What is OO for Field Reclosers
    1D-03
  2. What is OO for Vista Underground Distribution Switchgear
    1D-08
  3. What is OO for Operator Duties and Responsibilities
    1T-07B
  4. What is OO for LLP and ANRP Request for Downstream Distribution System - Procedure for Requests  and Blocking / Returning Reclosers
    1D-15
  5. What is OO for LLP and ANRP Research and Approval Procedures And Control Room Instructions for
    P3
    1D-50
  6. What is OO for Low Voltage Ties
    2T-28
  7. What is OO for Roles and Responsibilities of PICs and Field Workers
    1T-13
  8. What is OO for Distribution Plant Alteration and Operating Drawing Updates
    1D-01
  9. What is OO for Distribution Feeder Outage Notification
    1D-10
  10. What is OO for Distribution Feeder Switching Using Disconnect Switches
    2T-27
  11. What is OO for Distribution Substation Feeder Reclosing Policy
    1D-51
  12. What is OO for Station Callouts
    1T-82
  13. What is OO for LOGGING PROCEDURES
    1T-07
  14. What is OO for Switching Procedures, Designated Isolation Point and Equipment Not Ready for  Service
    1T-06
  15. What is OO for POCC
    1D-52
  16. What is OO for Distribution Mimic Displays
    1D-06
  17. What is OO for CROW
    1T-54(A,B,C,D)
  18. What is OO for Isolation Points and Line Cuts
    1T-09
  19. What is OO for Transfer of Operating Authority and Guarantee of No Reclose Procedures Within  the Control Centre
    1T-11
  20. What is OO for Power System Safety Protection (PSSP)
    1T-12
  21. What is OO for Live Line Permits, Assurance of No Reclose Permits, and Caution Tags
    1T-18
  22. What is OO for Distribution Underground Cable Fault Troubleshooting Procedure (Using a Hastings  Phase Tell Tool)
    1D-09
  23. What is OO for Distribution Substation Main Feeder Bus Reclosing Policy (35 kV and Below)
    1T-29B

What would you like to do?

Home > Flashcards > Print Preview