  1. Prior to hydrotest determine if structure will support weight
    Engineer
  2. Determine risk of brittle fracture prior to performing a pressure test
    Engineer
  3. Approve repair welding of cracks
    Engineer
  4. Design temporary repairs
    Engineer
  5. Determine longitudinal cracks wont grow beyond a FW patch
    Engineer
  6. Approve using lap patches with a material different than the pipe
    Engineer
  7. Allow temporary welded repairs to remain in place past "next oppurtunity"
    Engineer
  8. Allow temporary leak sealing devices to remain in place past "next oppurtunity"
    Engineer
  9. Allow exceptions to required preheat temperature for temporary repairs
    Engineer
  10. Review the use of Preheat in lieu of PWHT
    Engineer
  11. Exceptions to PWHT on temporary repairs
    Engineers
  12. Review the use of local PWHT n lieu of a rull encirclement PWHT
    Engineer
  13. Overall responsibility for complying with 570
    Owner
  14. Resonsible for developing and implenting a QA inspection/repair mgmt system
    Owner
  15. Responsible for implementing an effective MOC process
    Owner
  16. Choose to conduct RBI assesments
    Owner
  17. Assure individuals taking thickiness measurements are trained and qualified
    Owner
  18. Determine pressure for leak test (non-code tests)
    Owner
  19. When verifying new materials, determine the sampling percentage
    Owner
  20. Determine if PMI program is needed for existing facilities
    Owner
  21. Maintain a record of process fluid classifiction
    Owner
  22. Maintain piping records
    Owner
  23. Approve use of on-stream welding
    Owner
  24. Assure owner- testing, inspection, & examination activities meet code
    Inspector
  25. Evaluate and accept NDE examination results
    Inspector
  26. Get familiar with prior inspection data & repairs prior to inspections
    Inspector
  27. Get familiar with operating condtions & potential damage mechanisms of pipe system
    Inspector
  28. Select or adjust the # of CML's
    Inspector
  29. Verify that new alloy material during repairs & alterationsmeet specifications
    Inspector
  30. If incorrect material found in existing piping, determine amount of further verification
    Inspector
  31. Periodically inspect components found during PMI survey that are wrong materials
    Inspector
  32. Determine if crack-like flaws are the result of original weld fabrication
    Inspector
  33. Assess preferential weld corrosion
    Inspector
  34. Review and approval an interval deferral
    Inspector
  35. Revise an existing interval and document basis for change
    Inspector
  36. Authorize all repairs
    Inspector
  37. Designate hold points for repairs and alterations
    Inspector
  38. Provide general authorization for limited or routine repairs
    Inspector
  39. Approve all repair and alteration work at hold points
    Inspector
  40. Approve all repair and alteration work at completion of work
    Inspector
  41. Determine that wall thickness is adequate for on-stream welding
    Inspector
  42. Check preheat temerature when using preheat in lieu of PWHT
    Inspector
  43. Determine whether a pressure test is needed after repairs
    Inspector
  44. Perform UT flaw detection for finding linear flaws
    QUTE
  45. Perform UT as a substitute for a pressure test
    QUTE
  46. Also involve in makeing inspection plans for pipe that operates > 750 degrees
    Corrosion specialist
  47. Involved if the # of CML's will be significantly reduced or elimanated.
    corrosion specialist
  48. Select CML's for pipe systems subject to localized corrosion or cracking
    Corrosion specialist
  49. Responsible for QC during repairs or alterations
    Repair Organization
  50. Perform piping repairs
    repair organization
  51. Maintain record of qualified WPS's and WPQ's
    repair organization
  52. PRD's tested and repaired
    Exp. repair organization
  53. Determine surface prep for NDE exam. Inspector may need to consult with
    Guru
  54. Perform audit of owner/users to assure compliance with 570
    Competent
  55. Maintain certification records of NDE examiners
    Examiners employer
  56. Make corrections based on the audit of owner/users piping program
    Owners AIA
  57. Approve substituting NDE for a pressure test
    Inspector and Engineer
  58. Review and approve RBI assessments
    Inspector and Engineer
  59. Authorize all alterations
    Inspector and engineer
  60. Approve substituting NDE in lieu of a pressure test
    Inspector and Engineer
  61. Develop an inspection plan for a piping system
    Inspector and/or engineer
  62. Determine date to replace incorrect materials found during PMI survey
    Inspector, owner, and corrosion specialist
  63. Determine cause if short-term corrosion rate varies significantly
    Inspector and corrsion specialist
  64. Select corrosion rate that best reflects conditions
    Inspector and corrosion specialist
  65. approve all proposed methods of design, material, WPS's, NDE & testing
    Inspector or engineer
  66. review leak sealing procedures
    Inspector or Engineer
  67. Perform rerating calcs
    Inspector or engineer
  68. Perform on-stream inspections
    Inspector or Technician
  69. Perform thickness inspection
    Inspector or Technician
  70. Assess crack-like flaws and environmental cracking
    engineer or corrosion specialist
  71. determine need for non-thickness NDE techniques. Inspector and
    engineer or corrosion specialist
  72. Revise an existing interval that has unusual degradation issues. Inspector and
    Engineer or corrosion specialist
  73. Determine the inspection intervals
    Inspector or owner
  74. PMI new materials during repairs & alterations
    Inspector or technician
  75. Perform external inspection
    Inspector or qualified other
  76. Determine the inspection intervals for PRD's
    Inspector,or engineer, or qualified other