570 Who Dats(in order of code)

Card Set Information

Author:
egf4201
ID:
284393
Filename:
570 Who Dats(in order of code)
Updated:
2014-09-30 21:31:23
Tags:
570 Who Dats order code
Folders:

Description:
570 Who Dats(in order of code)
Show Answers:

Home > Flashcards > Print Preview

The flashcards below were created by user egf4201 on FreezingBlue Flashcards. What would you like to do?


  1. Overall responsibility for complying with API 570                                                    


                                4.1
    Owner
  2. Responsible for developing & implementing a QA insp/repair mgmnt system

     
                              4.3.1.1
    Owner
  3. Responsible for implementing an effective MOC process


                        4.3.1.2
    Owner
  4. Responsible for QC during repairs or alterations

                             4.3.3
    Repair organization
  5. Assure owner- testing, inspection, & examination activities meet code

                                    4.3.4
    Inspector
  6. Evaluate and accept NDE examination results


                              4.3.4
    Inspector
  7. Maintain certification records of NDE examiners


                                    4.3.5.3
    Examiners employer
  8. Develop an inspection plan for a piping system

                     5.1.1.1
    Inspector and/or Engineer
  9. Also involved in making inspection plans for pipe that operates > 750 degrees  


                      5.1.1.1
    corrosion specialist
  10. Choose to conduct RBI assesments


                          5.2
    Owner
  11. Get familiar with prior inspection data & repairs prior to inspections


                                5.3.5
    Inspector
  12. Get familiar with operating conditions & potential damage mechanisms of pipe system


                      5.4.1.2
    Inspector
  13. Perform on-stream inspections

        
           
                                 5.5.2
    Inspector or Technician
  14. Perform thickness inspection       



                                    5.5.3
    Inspector or Technician
  15. Assure individuals taking thickness measurements are trained and qualified


                     5.5.3
    Owner
  16. Determine cause if short-term corrosion rate varies significantly


                    5.5.3
    Inspector and corrosion specialist
  17. Perform external inspection



                                  5.5.4
    Inspector or qualified other
  18. Involved if the # of CML's will be significantly reduced or elimanted


                         5.6.2
    Corrosion specialist
  19. Select or adjust the # of CML's


                                  5.6.3
    Inspector
  20. Select CML's for pipe systems subject to localized corrosion or cracking


                   5.6.3
    Corrosion specialist
  21. Determine need for non-thickness NDE techniques. Inspector consults w/    


                        5.7.2
    Engineer or corrosion specialist
  22. Determine surface prep for NDE exam. Inspector made need to consult with

     
                     5.7.3
    Guru
  23. Perform UT flaw detection for finding linear flaws


                   5.7.4
    QUTE
  24. Determine pressure for leak tests (non-code tests)


                                            5.8
    Owner
  25. Prior to hydrotest determine if structure will support weight


                                     5.8
    Engineer
  26. Determine risk of brittle fracture prior to performing a pressure test 


                                           5.8.3
    engineer
  27. Approve substituting NDE for a pressure test


                        5.8.5
    Inspector and engineer
  28. Perform UT as a substitute for a pressure test


                     5.8.5
    QUTE
  29. Verify that new alloy material during repairs & alteration meet specifications


                      5.9
    inspector
  30. When verifying new materials, determine the sampling percentage 


                     5.9
    Owner
  31. PMI new materials during repairs & alterations


                        5.9
    Inspector and Technician
  32. If incorrect material found in existing pipe, determine amount of further verification

                                     5.9
    Inspector
  33. Determine in PMI program is needed for existing facilities


                  5.9
    Owner
  34. Determine date to replace incorrect materials found during PMI survey


                    5.9
    Inspector and owner and corrosion specialist
  35. Periodically inspect components found during PMI surrvey that are wrong materials


                     5.9
    Inspector
  36. Determine if crack-like weld flaws are the result of original weld fabrication


                              5.11
    Inspector
  37. Assess crack-like flaws and environmental cracking


                              5.11
    Engineer or corrosion specialist
  38. Assess preferential weld corrosion


                      5.11
    Inspector
  39. Perform audit of  owner/users to assure compliance with 570    


                   5.13
    Competent
  40. Make corrections based on the audit of owner/users piping program


                           5.13
    Owners AIA
  41. Review and approve RBI assessments


                  6.3.2
    Inspector and engineer
  42. Determine the inspection intervals  



                      6.3.3
    inspector or owner
  43. Maintain a record of process fluid classification


                        6.3.4.1
    Owner
  44. PRD's tested and repaired


                    6.7.1
    Exp.   repair organization
  45. Determine the inspection intervals for PRD's


                   6.7.3.1
    Inspector or engineer or qualified other
  46. Select corrosion rate that best reflects conditions 


                    7.1.1
    Inspector and corrosion specialist
  47. Maintain piping records 


                 7.6.1
    Owner
  48. Review and approval an interval deferral


                              7.10
    Inspector
  49. Revise an existing interval and document basis for change


                  7.10
    Inspector
  50. Revise an existing interval that has unusual degradation issues. Inspector and:


                 7.10
    Engineer or corrosion specialist
  51. Perform piping repairs


                 8.1.2
    repair organization
  52. Authorize all repairs



    8.1.2
    Inspector
  53. Authorize all alterations



    8.1.2
    inspector and engineer
  54. Designate hold points for repairs and alterations


    8.1.2
    Inspector
  55. Provide general authorization for limited or routine repairs


    8.1.2
    Inspector
  56. Approve all proposed methods of design, materials, WPS's, NDE & testing


    8.1.3
    Inspector or engineer
  57. Approve use of on-stream welding



    8.1.3
    Owner
  58. Approve repair welding of cracks


    8.1.3
    Engineer
  59. Appove all repair and alteration work at hold points



    8.1.3
    Inspector
  60. Approve all repair and alteration work at completion of work


    8.1.3
    Inspector
  61. Design temporary repairs



    8.1.4.1
    Engineer
  62. Determine longitudinal cracks won't grow beyond FW patch


    8.1.4.1
    Engineer
  63. Appove using lap patches with a material different than the pipe


    8.1.4.1
    Engineer
  64. Determine that wall thickness is adequate for on-stream welding


    8.1.4.1
    Inspector
  65. Allow temporary welded repairs to remain in place past "next oppurtunity"


    8.1.4.1
    Engineer
  66. Allow temporary leak sealing devices to remain in place past "next oppurtunity"


    8.1.5
    Engineer
  67. Review leak sealing procedures



    8.1.5
    Inspector or engineer
  68. Maintain record of qualified WPS's and WPQ's



    8.2.2
    Repair organization
  69. Allow exceptions to required preheat temperature for temporary repairs


    8.2.3.2
    Engineer
  70. check preheat temperature when using preheat in lieu of PWHT


    8.2.3.2
    Inspection
  71. Review the use of preheat in lieu of PWHT


    8.2.3.2
    engineer
  72. Exceptions to PWHT on temporary repairs



    8.2.3.3
    Engineer
  73. Review the use of a local PWHT in lieu of a full encirclement PWHT


    8.2.3.3
    Engineer
  74. Determine whether a pressure test is needed after repairs


    8.2.7
    Inspector
  75. Approve substituting NDE in lieu of a pressure test


    8.2.7
    Inspector and engineer
  76. Perform rerating calcs


    8.3
    Inspector or engineer