API 510/570 DATA SHEETS(KEY WORDS)

Card Set Information

Author:
egf4201
ID:
285309
Filename:
API 510/570 DATA SHEETS(KEY WORDS)
Updated:
2015-10-03 13:08:28
Tags:
API 510 570 DATA SHEETS KEY WORDS
Folders:
API 510/570 DATA SHEETS(KEY WORDS)
Description:
API 510/570 DATA SHEETS(KEY WORDS)
Show Answers:

Home > Flashcards > Print Preview

The flashcards below were created by user egf4201 on FreezingBlue Flashcards. What would you like to do?


  1. Define- alteration
    physical change
  2. Define- repair
    • restore
    • suitable
  3. Define- imperfection that exceeds the acceptance criteria
    defect
  4. Define- discontinuity that may or may not exceed the acceptance criteria
    imperfection
  5. Define- RBI's two primary factors
    • probability
    • consequence
  6. NDE- number of CML's to obtain thickness readings during inspection
    Represent- ative
  7. NDE- CML that must be measured during a thickness inspection
    CML w/ earliest renewal date
  8. PRD's- how relief device intervals are determined
    performance
  9. Insp- basis of API 570's piping classification
    consequence of failure
  10. Corrosion- method by which process leaks can lead to brittle failure
    auto-refridgeration
  11. Corrosion- factors that affect the creep rate
    time, temp, stress
  12. corrosion- cause of fatigue crack
    cyclic stress
  13. corrosion- type of soil that is most corrosive
    low resistivity
  14. repairs- # of new flange assemblies to be inspected during repairs and alterations
    represent- ative

What would you like to do?

Home > Flashcards > Print Preview