API 510 WHO DOES IT BY PERSON

Card Set Information

Author:
egf4201
ID:
291184
Filename:
API 510 WHO DOES IT BY PERSON
Updated:
2014-12-13 23:31:43
Tags:
API 510 WHO DOES IT PERSON
Folders:
API 510 WHO DOES IT BY PERSON
Description:
API 510 WHO DOES IT BY PERSON
Show Answers:

Home > Flashcards > Print Preview

The flashcards below were created by user egf4201 on FreezingBlue Flashcards. What would you like to do?


  1. Assure owner- testing, inspection, and examination activities are met
    Inspector
  2. Evaluate and accept NDE examination results
    Inspector
  3. Review prior vessel history prior to inspections
    inspector
  4. Familiar with characteristics of potential damage mechanisms
    inspector
  5. Perform internal inspection
    inspector
  6. Approve on-stream inspection work performed by examiners
    inspector
  7. Determines when a pressure test is needed after a repair- "believes"
    inspector
  8. During hydro of 300 SS, verify water quality and vessel is drained and dried
    inspector
  9. Verify new materials are consistent with those specified
    inspector
  10. If incorrect material found in existing vessel, determine amount of further verification
    inspector
  11. Assess preferential corrosion in welds
    Inspector
  12. Inspect new vessels at time of inspection
    Inspector
  13. Approve the use of On-stream inspection in lieu of internal
    Inspector
  14. Authorize all vessel repairs
    Inspector
  15. Designate hold point (fabrication approvals)
    Inspector
  16. Repairs- approve all methods of design, materials, WPS's, NDE & testing
    Inspector
  17. Approve all repair and alteration work at hold points
    Inspector
  18. Approve all repair and alteration work at completion of work
    Inspector
  19. Monitor the repairs made to SS cladding
    Inspector
  20. Monitor preheat temperatures
    Inspector
  21. oversee the attachment of a nameplate after rerating was performed
    Inspector
  22. Perform On-stream inspection
    Inspector or Technician
  23. Take thickness measurements
    Inspector or Technician
  24. PMI new materials during repairs & alterations
    Inspector or Technicians
  25. Assess crack-like flaws attributed to environmental cracking
    Engineer or corrosion specialist
  26. Perform calculations for rerate
    Engineer or manufacturer
  27. Approve substituting NDE for a pressure test
    Inspector and Engineer
  28. Review and approve RBI assessments that extend intervals beyond 10 years
    Inspector and Engineer
  29. Authorize all repairs to Div. 2 vessels
    Inspector and Engineer
  30. Authorize all alterations
    Inspector and Engineer
  31. Alterations- approve all methods of design, materials, WPS's, NDE, & testing
    Inspector and Engineer
  32. Allow temporary welded repairs to remain in place past "next opportunity"
    Inspector and Engineer
  33. Approve the use of fillet-welded patch repairs
    Inspector and Engineer
  34. Approve the use of lap band repair
    Inspector and Engineer
  35. Review the repair procedures for SS cladding
    Inspector and Engineer
  36. Approve use of alternate NDE methods after repairs & alterations
    Inspector and Engineer
  37. Determine whether it's necessary to remove deposits or lining
    Inspector and Corrosion specialist
  38. Review corrosion data if short-term corrosion rate varies significantly
    Inspector and Corrosion specialist
  39. Select which corrosion rate(short vs long) reflects the current conditions
    Inspector and Corrosion specialist
  40. Determine type of expected damage and select NDE method
    Inspector and Engineer or Corrosion specialist
  41. Develop the inspection plan for vessels & relief devices
    Inspector or Engineer
  42. Determine the external & internal inspection interval
    Inspector or Engineer
  43. Determine the relief device interval
    Inspector or Engineer or qualified other
  44. When verifying new materials, determine the sampling percentage
    Inspector or Owner
  45. Perform external inspections
    Inspector or qualified other
  46. Review use of a component pressure test in lieu of complete vessel hydro
    Engineer
  47. Approve all nozzle installations
    Engineer
  48. Determine that a crack will not propagate from under a fillet weld patch
    Engineer
  49. Authorize the repair welding of cracks at stress concentrations
    Engineer
  50. Allow exceptions to preheat temperatures
    Engineer
  51. Authorize the repair welding of cracks at stress concentrations
    Engineer
  52. Review the use of PWHT in lieu of a full encirclement PWHT
    Engineer
  53. Review the use of preheat in lieu of PWHT
    Engineer
  54. Review the use of controlled deposit welding in lieu of PWHT
    Engineer
  55. Overall responsibility for complying with API 510
    Owner
  56. choose to conduct RBI assessments
    Owner
  57. Assure those taking thickness measurements are trained and qualified
    Owner
  58. Determine the test pressure for non-code related pressure tests
    Owner
  59. Maintain vessel and relief device records
    Owner
  60. Review the inspection plan for equipment operating at elevated temperatures
    Corrosion specialist
  61. Determine the locations of CML's for vessels with localized corrosion
    Corrosion specialist
  62. Involved if the number of CML's will be significantly reduced or eliminated
    Corrosion specialist
  63. During repairs and alterations- responsible for QC
    Repair organization
  64. Perform UT flaw detection for finding linear flaws
    QUTE
  65. Maintain record of qualified WPS's and WPQ's
    repair organization