  1. Which OO contains the index for BC Hydro OOs?
    • 1T-00
    • Index of BC Hydro Operating Orders
  2. Which OO explains the general format for all operating orders including numbering structure and subject groups?
    • IT-01
    • BC Hydro Operating Orders - Origin, Administration, Execution
  3. Which OO series explains the T&D JOB LIFECYCLE SAFETY SYSTEM?
    1T-02 Series (A – E)
  4. Which OO outlines a standard safe practice to control backfeed from voltage transformers, including CVTs and metering kits, when issuing Safety Protection Guarantees (SPG).
    • 1T-03
    • Backfeed From Voltage Transformers (CVT and PT)
  5. Which OO discusses hazardous procedures regarding circulating currents may be created on de-energized transmission lines due to electrostatic and electromagnetic induction from adjacent parallel energized circuits if the line is grounded in more than one location?
    • 1T-04
    • Work on a De-energized Transmission Line That is Parallel to Energized Line(s)
  6. Which OO outlines the process to be followed at the BCH Control Centre for the issue and return of Safety Protection Guarantees (SPG’s)?
    • 1T-05
    • Safety Protection Issue Process
  7. Which OO discusses the use of Designated Isolation Points (DIP)?
    • 1T-06
    • Switching Procedures, Designated Isolation Point and Equipment Not Ready for Service
  8. Which OO discusses the use of 3 part communication for switching procedures?
    • 1T-06
    • Switching Procedures, Designated Isolation Point and Equipment Not Ready for Service
  9. Which OO discusses the process issuing verbal and written switching orders?
    • 1T-06
    • Switching Procedures, Designated Isolation Point and Equipment Not Ready for Service
  10. Which OO outlines acceptable abbreviations to be used for switching instructions?
    • 1T-06
    • Switching Procedures, Designated Isolation Point and Equipment Not Ready for Service
  11. Which OO discusses the requirements for three part communication?
    • 1T-06
    • Switching Procedures, Designated Isolation Point and Equipment Not Ready for Service
  12. Which OO outlines what field workers must state to the PIC upon returning an SPG?
    • 1T-06 (Equipment not ready for service portion)
    • Switching Procedures, Designated Isolation Point and Equipment Not Ready for Service