Api 510 who does it problem childs

Card Set Information

Author:
egf4201
ID:
310802
Filename:
Api 510 who does it problem childs
Updated:
2015-11-02 15:42:52
Tags:
Api 510 who does it problem childs
Folders:
Api 510 who does it problem childs
Description:
Api 510 who does it problem childs
Show Answers:

Home > Flashcards > Print Preview

The flashcards below were created by user egf4201 on FreezingBlue Flashcards. What would you like to do?


  1. Approve the use of fillet-welded patch repairs
    Inspector and Engineer
  2. determine the locations of CML's for vessels with localized corrosion
    Corrosion specialise
  3. Authorize the repair welding of cracks at stress concentrations
    Engineer
  4. Review use of a component pressure test in lieu of complete vessel hydro
    Engineer
  5. Develop the inspection plan for vessels & relief devices
    Inspector or Engineer
  6. Determine the external and internal inspection interval
    Inspector or Engineer
  7. Review corrosion data if short term corrosion rate varies significantly
    Inspector and Corrosion specialist
  8. Authorize the repair welding of cracks at stress concentrations
    Engineer
  9. When verifying new materials, determine the sampling percentage
    Inspector or Owner
  10. Allow temporary welded repairs to remain in place past "next opportunity"
    Inspector and Engineer
  11. Determine whether it's necessary to remove deposits or lining
    Inspector and Corrosion specialist
  12. Determine the relief device interval
    Inspector or Engineer or Qualified other
  13. Assess crack-like flaws attributed to environmental cracking
    Engineer or Corrosion Specialist
  14. Review the use of controlled deposit welding in lieu of PWHT
    Engineer
  15. Approve the use of lap band repair
    Inspector and Engineer

What would you like to do?

Home > Flashcards > Print Preview