  1. What EOCC procedure is used for Diesel Generator Overload?
    MDGOL?
  2. What is the automatic load shedding 1 stage?
    2,750 kw for 1 se
  3. What is the automatic load shedding 2 stage?
    2,750 kw for 10 sec
  4. What should be the next step if load cannot be reduced by load shedding?
    Proceed to immediate actions
  5. What words should the EOOW pass over the 1MC?
    “Do not start or stop electrical or electronic equipment without first contacting EOOW”.
  6. What reports the EOOW make to the OOD?
    • “No. __ SSDG overload. Electrical plant configuration is __.”
    • “Load reduced/not reduced on No. __ SSDG by load shedding.”
  7. What Controlling Actions of the EPCC?
    • Monitor electrical load
    • Verify stage 1 and 2 load shed have occurred on affected bus
    • Report status to EOOW
  8. What are the Rover/CRT controlling actions?
    Test for grounds in the switchboard
  9. What will prompt EOOW to proceed to immediate actions?
    When automatic load shedding fails
  10. What are the Immediate Actions of the EPCC?
    • Initiate stage 1 and 2 load shed
    • When load shedding fail to correct overload:
    • Start stby generator
    • Split bus and determine cause of overload
    • Report to EOOW source of overload and plat status
  11. What report should the EOOW make to the OOD?
    “Source of overload isolated. Electrical plant configuration is __.”

Card Set Information

Author:
pascual
ID:
323858
Filename:
EOCC-MDGOL
Updated:
2016-09-29 18:50:37
Tags:
EOOW
Folders:

Description:
MDGOL
Show Answers:

Home > Flashcards > Print Preview