  1. Integration Management
    processes and activities needed to properly coordinate all aspects of the project to meet stakeholder expectations

    • Processes:
    • 4.1 Develop project charter
    • 4.2 Develop project management plan
    • 4.3 Direct and manage project execution
    • 4.4 Monitor and control project work
    • 4.5 Perform integrated change control
    • 4.6 Close project or phase
  2. Develop Project Charter
    Authorizes a project or phase

    • Inputs:
    • 1. SOW
    • 2. Business Case
    • 3. Contract
    • 4. EEF
    • 5. OPA

    • Tools:
    • 1. Expert Judgment

    • Outputs:
    • 1. Project Charter
  3. Develop Project Management Plan
    Collection of all subsidiary plans

    • Inputs:
    • 1. Project Charter
    • 2. Outputs from planning processes
    • 3. EEF
    • 4. OPA

    • Tools:
    • 1. Expert Judgment

    • Outputs:
    • 1. Project Management Plan
  4. Direct and Manage Project Execution
    PM directs performance of activities in the plan

    • Inputs:
    • 1. Project Management Plan
    • 2. Approved Change Requests
    • 3. EEF
    • 4. OPA

    • Tools
    • 1. Expert Judgment
    • 2. Project Management Information System

    • Outputs:
    • 1. Deliverables
    • 2. Work performance information
    • 3. Change requests
    • 4. Project Management Plan updates
    • 5. Project Document Updates
  5. Monitor and Control Project Work
    constantly measure and report performance; determine appropriate preventative & corrective action

    • Inputs:
    • 1. Project management plan
    • 2. Performance reports
    • 3. EEF
    • 4. OPA

    • Tools:
    • 1. Expert Judgment

    • Outputs:
    • 1. Change requests
    • 2. Project management plan updates
    • 3. Project document updates
  6. Perform Integrated Change Control
    continuously manage changes & maintain a baseline

    • Inputs:
    • 1. Project management plan
    • 2. Work performance information
    • 3. Change requests
    • 4. EEF
    • 5. OPA

    • Tools:
    • 1. Expert Judgment
    • 2. Change control meetings

    • Outputs:
    • 1. Change request status updates
    • 2. Project management plan updates
    • 3. Project document updates
  7. Close project or phase
    procedures to close a project or phase

    • Inputs:
    • 1. Project management plan
    • 2. accepted deliverables
    • 3. OPA

    • Tools:
    • 1. Expert Judgment

    • Outputs:
    • 1. Final product, service or result transition
    • 2. OPA updates
  8. Scope Management
    processes needed to ensure the project includes all the work required and ONLY the work required to complete the project successfully; carefully identifies what IS and IS NOT included in the project (ie. project boundaries)

    • processes:
    • 5.1 Collect requirements
    • 5.2 Define Scope
    • 5.3 Create WBS
    • 5.4 Verify Scope
    • 5.5 Control Scope
  9. Collect Requirements
    define and document stakeholder needs to meet project objectives

    • Inputs:
    • 1. Project charter
    • 2. Stakeholder register

    • Tools:
    • 1. Interviews
    • 2. Focus Groups
    • 3. Facilitated Workshops
    • 4. Group Creativity Techniques
    • 5. Group Decision Making techniques
    • 6. Questionnaires & surveys
    • 7. Observations
    • 8. Prototypes

    • Outputs:
    • 1. Requirements documentation
    • 2. Requirements management plan
    • 3. Requirements traceability matrix
  10. Define Scope
    develops a detailed, written scope statement

    • Inputs:
    • 1. Project charter
    • 2. Requirements documentation
    • 3. OPA

    • Tools:
    • 1. Expert Judgment
    • 2. Product analysis
    • 3. Alternatives Identification
    • 4. Facilitated workshops

    • Outputs:
    • 1. Project Scope Statement
    • 2. Project Document updates
  11. Create WBS
    subdivides the work into smaller, more manaageable components

    • Inputs:
    • 1. Project scope statement
    • 2. Requirements documentation
    • 3. OPA

    • Tools:
    • 1. Decomposition

    • Outputs:
    • 1. WBS
    • 2. WBS dictionary
    • 3. Scope baseline
    • 4. Project document updates
  12. Verify Scope
    formalizing acceptance of completed project deliverables

    • Inputs:
    • 1. Project Management Plan
    • 2. Requirements Documentation
    • 3. Requirements Traceability Matrix
    • 4. Validated Deliverables

    • Tools:
    • 1. Inspection

    • Outputs:
    • 1. Accepted Deliverables
    • 2. Change Requests
    • 3. Project Document Updates
  13. Control Scope
    monitoring status and controlling changes to the project scope

    • Inputs:
    • 1. Project management plan
    • 2. work performance information
    • 3. requirements documentation
    • 4. requirements traceability matrix
    • 5. OPA

    • Tools:
    • 1. Variance analysis

    • Outputs:
    • 1. Work performance measurements
    • 2. OPA updates
    • 3. Change Requests
    • 4. Project Management Plan updates
    • 5. Project document updates
  14. Time management
    processes needed to ensure timely completion of the project

    • processes:
    • 6.1 Define Activities
    • 6.2 Sequence Activities
    • 6.3 Estimate Activity Resources
    • 6.4 Estimate Activity Durations
    • 6.5 Develop Schedule
    • 6.6 Control Schedule
  15. Define Activities
    identifying the activities that must be performed

    • Inputs:
    • 1. Scope baseline
    • 2. EEF
    • 3. OPA

    • Tools:
    • 1. Decomposition
    • 2. Rolling Wave Planning
    • 3. Templates
    • 4. Expert Judgment

    • Outputs:
    • 1. Activity List
    • 2. Activity Attributes
    • 3. Milestone List
  16. Sequence Activities
    identifying activity dependencies

    • Inputs:
    • 1. activity list
    • 2. activity attributes
    • 3. milestone list
    • 4. project scope statement
    • 5. OPA

    • Tools:
    • 1. Precedence Diagram Method (PDM)
    • 2. Dependency determination
    • 3. applying leads and lags
    • 4. Schedule network templates

    • Outputs:
    • 1. Project schedule network diagrams
    • 2. project document updates
  17. Estimate activity resources
    estimating the type & quantity of resources needed

    • Inputs:
    • 1. activity list
    • 2. activity attributes
    • 3. resource calendars
    • 4. EEF
    • 5. OPA

    • Tools:
    • 1. Expert judgment
    • 2. alternatives analysis
    • 3. published estimating data
    • 4. bottom-up estimating
    • 5. project management software

    • Outputs:
    • 1. Activity resource requirements
    • 2. resource breakdown structure (rbs)
    • 3. project document updates
  18. Estimate activity durations
    estimating durations of individual activities

    • Inputs:
    • 1. activity list
    • 2. activity attributes
    • 3. activity resource requirements
    • 4. resource calendars
    • 5. project scope statement
    • 6. EEF
    • 7. OPA

    • Tools:
    • 1. expert judgment
    • 2. analogous estimating
    • 3. parametric estimating
    • 4. bottom-up estimating
    • 5. project management software

    • Outputs:
    • 1. activity duration estimates
    • 2. project document updates
  19. Develop Schedule
    analyzing sequences, durations, resource requirements and contstraints to create the project schedule

    • Inputs:
    • 1. activity list
    • 2. activity attributes
    • 3. network diagrams
    • 4. resource requirements
    • 5. resource calendars
    • 6. duration estimates
    • 7. scope statement
    • 8. EEF
    • 9. OPA

    • Tools:
    • 1. network analysis
    • 2. critical path method
    • 3. critical chain method
    • 4. resource leveling
    • 5. what-if scenario analysis
    • 6. applying leads & lags
    • 7. Schedule compression
    • 8. Scheduling tool

    • Outputs:
    • 1. Project schedule
    • 2. Schedule baseline
    • 3. Schedule data
    • 4. Project document updates
  20. Control Schedule
    monitoring status and managing changes to the schedule baseline

    • Inputs:
    • 1. Project management plan
    • 2. project schedule
    • 3. work performance information
    • 4. OPA

    • Tools:
    • 1. Performance reviews
    • 2. variance analysis
    • 3. project management software
    • 4. resource leveling
    • 5. what-if scenario analysis
    • 6. adjust leads & lags
    • 7. schedule compression
    • 8. scheduling tool

    • Outputs:
    • 1. work performance measurements
    • 2. OPA updates
    • 3. change requests
    • 4. project management plan updates
    • 5. project document updates
  21. Cost Management
    processes for estimating, budgeting & controlling costs so the project can be completed within budget

    • processes:
    • 7.1 Estimate Costs
    • 7.2 Determine Budget
    • 7.3 Control Costs
  22. Estimate Costs
    estimating the costs of resources needed to complete project activities

    • Inputs:
    • 1. Scope baseline
    • 2. project schedule
    • 3. human resources plan
    • 4. risk register
    • 5. EEF
    • 6. OPA

    • Tools:
    • 1. Expert Judgment
    • 2. Analogous Estimating
    • 3. Parametric Estimating
    • 4. Bottom-up estimating
    • 5. Three-point estimates
    • 6. reserve analysis
    • 7. cost of quality
    • 8. project management estimating software
    • 9. vendor bid analysis

    • Outputs:
    • 1. activity cost estimates
    • 2. basis of estimates
    • 3. project document updates
  23. Determine Budget
    aggregating estimated costs to establish cost baseline

    • Inputs:
    • 1. Activity cost estimates
    • 2. basis of estimates
    • 3. scope baseline
    • 4. project schedule
    • 5. resource calendars
    • 6. contracts
    • 7. OPA

    • Tools:
    • 1. cost aggregation
    • 2. reserve analysis
    • 3. expert judgment
    • 4. historical relationships
    • 5. funding limit reconciliation

    • Outputs:
    • 1. cost performance baseline
    • 2. project funding requirements
    • 3. project document updates
  24. Control costs
    monitoring status and maanging changes to the cost baseline

    • Inputs:
    • 1. Project Management Plan
    • 2. Project funding requirements
    • 3. work performance information
    • 4. OPA

    • Tools:
    • 1. Earned value management
    • 2. Forecasting
    • 3. To-complete performance index
    • 4. performance reviews
    • 5. variance analysis
    • 6. project management software

    • Outputs:
    • 1. work performance measurements
    • 2. budget forecasts
    • 3. OPA updates
    • 4. change requests
    • 5. project management plan updates
    • 6. project document updates
  25. Quality Management
    processes to ensure the project will satisfy the needs for which it was undertaken & implement a quality management system

    • processes:
    • 8.1 Plan Quality
    • 8.2 Perform Quality Assurance
    • 8.3 Perform Quality Control
  26. Plan Quality
    identifying relevant quality requirements/standards& documenting how th eproject will demonstrate compliance

    • Inputs:
    • 1. Scope baseline
    • 2. stakeholder register
    • 3. cost performance baseline
    • 4. schedule baseline
    • 5. risk register
    • 6. EEF
    • 7. OPA

    • Tools:
    • 1. cost-benefit analysis
    • 2. cost of quality
    • 3. control charts
    • 4. benchmarking
    • 5. experiments
    • 6. statistical sampling
    • 7. flowcharting
    • 8. proprietary methodologies
    • 9. additional quality planning tools

    • Outputs:
    • 1. Quality management plan
    • 2. Quality metrics
    • 3. Quality checklists
    • 4. Process improvement plan
    • 5. Project document updates
  27. Perform Quality Assurance
    ensuring the project uses all processes needed to meet requirements. the ultimate purpose of QA is quality improvement

    • Inputs:
    • 1. project management plan
    • 2. quality metrics
    • 3. work performance information
    • 4. QC measurements

    • Tools:
    • 1. Plan quality & perform quality control tools
    • 2. quality audits
    • 3. process analysis

    • Outputs:
    • 1. OPA updates
    • 2. Change requests
    • 3. Project management plan updates
    • 4. Project document updates
  28. Perform quality control
    monitoring results for compliance & recommending necessary changes

    • Inputs:
    • 1. project management plan
    • 2. quality metrics
    • 3. quality checklists
    • 4. work performance measurements
    • 5. approved change requests
    • 6. deliverables
    • 7. OPA

    • Tools:
    • 1. cause/effect diagram
    • 2. control charts
    • 3. flowcharting
    • 4. histogram
    • 5. pareto chart
    • 6. run chart
    • 7. scatter diagram
    • 8. statistical sampling
    • 9. inspection
    • 10. approved change requests review

    • Outputs:
    • 1. QC measurements
    • 2. Validated changes
    • 3. Validated deliverables
    • 4. OPA updates
    • 5. change requests
    • 6. Project management plan updates
  29. Human Resources Management
    processes that organize and manage the project team

    • Processes:
    • 9.1 Develop HR plan
    • 9.2 Acquire Project Team
    • 9.3 Develop Project Team
    • 9.4 Manage Project Team
  30. Develop HR plan
    establishing roles, responsibilities, reporting relationships & creating a staffing management plan

    • Inputs:
    • 1. Activity resource requirements
    • 2. EEF
    • 3. OPA

    • Tools:
    • 1. Org charts & position descriptions
    • 2. Networking
    • 3. Organizational Theory

    • Outputs
    • 1. Human Resources Plan
  31. Acquire Project Team
    getting the human resources needed to complete the project

    • Inputs:
    • 1. Project management plan
    • 2. EEF
    • 3. OPA

    • Tools:
    • 1. Pre-assignment
    • 2. negotiation
    • 3. acquisition
    • 4. virtual teams

    • Outputs:
    • 1. staff assignments
    • 2. resource calendars
    • 3. project management plan updates
  32. Develop project team
    improving competencies, interaction of the team & overall team environment

    • Inputs:
    • 1. staff assignments
    • 2. project management plan
    • 3. resource calendars

    • Tools:
    • 1. Interpersonal skills
    • 2. Training
    • 3. Team building
    • 4. Ground rules
    • 5. co-location
    • 6. recognition and rewards

    • Outputs:
    • 1. Team performance assessments
    • 2. EEF updates
  33. Manage project team
    tracking performance, providing feedback, resolving issues & coordinating changes

    • Inputs:
    • 1. Staff assignments
    • 2. project management plan
    • 3. team performance assessments
    • 4. performance reports
    • 5. organizational process assets

    • Tools:
    • 1. observation & conservation
    • 2. performance appraisals
    • 3. conflict management
    • 4. issue log
    • 5. interpersonal skills

    • Outputs:
    • 1. EEF updates
    • 2. OPA updates
    • 3. change requests
    • 4. project management plan updates
  34. Communication management
    processes to ensure the timely & appropriate generation, collection, distribution, storage & ultimate disposition of the project

    processes:

    • 10.1 Identify Stakeholders
    • 10.2 Plan communications
    • 10.3 Distribute information
    • 10.4 Manage stakeholder expectations
    • 10.5 Report performance
  35. Identify Stakeholders
    identifying the interests, involvement & influence of people & organizations impacted by the project

    • Inputs:
    • 1. Project charter
    • 2. procurement documents
    • 3. EEF
    • 4. OPA

    • Tools:
    • 1. Stakeholder analysis
    • 2. expert judgment

    • Outputs:
    • 1. Stakeholder register
    • 2. stakeholder managemetn strategy
  36. Plan communications
    determining the information needs of stakeholders

    • Inputs:
    • 1. stakeholder register
    • 2. stakeholder management strategy
    • 3. EEF
    • 4. OPA

    • tools:
    • 1. communication requirements analysis
    • 2. communication technology
    • 3. communication models
    • 4. communication methods

    • Outputs:
    • 1. communications management plan
    • 2. project document updates
  37. Distribute Information
    making information available in a timely manner

    • Inputs:
    • 1. Project management plan
    • 2. performance reports
    • 3. OPA

    • Tools:
    • 1. Communication methods
    • 2. Information distribution tools

    • Outputs:
    • 1. OPA updates
  38. Manage Stakeholder Expectations
    communicating and working with stakeholders to meet their needs and resolve issues

    • Inputs:
    • 1. Stakeholder register
    • 2. Stakeholder management strategy
    • 3. Project management plan
    • 4. Issue log
    • 5. Change log
    • 6. OPA

    • Tools:
    • 1. Communication methods
    • 2. Interpersonal skills
    • 3. Management skills

    • Outputs:
    • 1. OPA updates
    • 2. Change requests
    • 3. Project management plan updates
    • 4. Project document updates
  39. Report Performance
    collecting & disseminating performance information

    • Inputs:
    • 1. project management plan
    • 2. work performance information
    • 3. work performance measurements
    • 4. budget forecasts
    • 5. OPA

    • Tools:
    • 1. Variance analysis
    • 2. Forecasting methods
    • 3. Communication methods
    • 4. Reporting Systems

    • Outputs:
    • 1. Performance reports
    • 2. OPA updates
    • 3. Change requests
  40. Risk management
    processes concerned with planning, identifying, analyzing, responding and controlling project risks

    processes:

    • 11.1 Plan risk management
    • 11.2 Identify risks
    • 11.3 Perform qualitative risk analysis
    • 11.4 Perform quantitative risk analysis
    • 11.5 Plan risk responses
    • 11.6 Monitor & control risks
  41. Plan risk management
    how to approach, plan & execute risk management

    • Inputs:
    • 1. Project scope statement
    • 2. cost management plan
    • 3. schedule management plan
    • 4. communications management plan
    • 5. EEF
    • 6. OPA

    • Tools:
    • 1. Planning meetings and analysis

    • Outputs:
    • 1. risk management plan
  42. Identify risks
    determining which risks might affect the project

    • Inputs:
    • 1. risk management plan
    • 2. activity cost estimates
    • 3. activity duration estimates
    • 4. scope baseline
    • 5. stakeholder register
    • 6. cost management plan
    • 7. schedule management plan
    • 8. quality management plan
    • 9. project documents
    • 10. EEF
    • 11. OPA

    • Tools:
    • 1. Documentation reviews
    • 2. Information gathering techniques
    • 3. checklist analysis
    • 4. assumptions analysis
    • 5. diagramming techniques
    • 6. SWOT analysis
    • 7. Expert judgment

    • Outputs:
    • 1. risk register
  43. Perform Qualitative risk analysis
    prioritizing risks for further analysis or action (probability v. impact)

    • Inputs:
    • 1. risk register
    • 2. risk management plan
    • 3. project scope statement
    • 4. OPA

    • Tools:
    • 1. risk probability and impact
    • 2. probability and impact matrix
    • 3. risk data quality assessment
    • 4. risk categorization
    • 5. risk urgency assessement
    • 6. Expert judgment

    • Outputs:
    • 1. risk register updates
  44. Perform quantitative risk analysis
    numerically analyzing the potential effect of identified risks

    • Inputs:
    • 1. risk register
    • 2. risk management plan
    • 3. cost management plan
    • 4. schedule management plan
    • 5. OPA

    • Tools:
    • 1. data gathering and representation techniques
    • 2. quantitative risk analysis and modeling techniques
    • 3. expert judgment

    • Outputs:
    • 1. risk register updates
  45. Plan risk responses
    how to enhance opportunities & reduce threats

    • Inputs:
    • 1. risk register
    • 2. risk management plan

    • Tools:
    • 1. strategies for negative risks or threats
    • 2. strategies for positive risks or opportunities
    • 3. contingent response strategies
    • 4. expert judgment

    • Outputs:
    • 1. risk register updates
    • 2. risk-related contract decisions
    • 3. project plan updates
  46. Monitor & Control risks
    monitoring identified risks, identifying new risks & evaluating risk response plans

    • Inputs:
    • 1. risk register
    • 2. project management plan
    • 3. work performance information
    • 4. performance reports

    • Tools:
    • 1. Risk Reassessment
    • 2. Risk Audits
    • 3. Variance & Trend Analysis
    • 4. Technical performance measurement
    • 5. Reserve Analysis
    • 6. Status Meetings

    • Outputs:
    • 1. Risk register updates
    • 2. OPA updates
    • 3. change requests
    • 4. Project plan updates
    • 5. Project document updates
  47. Procurement management
    processes to acquire products, services or results from outside the project team

    • processes:
    • 12.1 Plan procurements
    • 12.2 Conduct procurements
    • 12.3 Administer procurements
    • 12.4 Close procurements
  48. Plan Procurements
    documenting purchasing decisions, specifying the approach, and identifying potential sellers

    • Inputs:
    • 1. Scope baseline
    • 2. Requirements documentation
    • 3. Teaming agreemetns
    • 4. Risk Register
    • 5. Risk-related Contract decisions
    • 6. Activity resource requirements
    • 7. Project schedule
    • 8. Activity cost estimates
    • 9. Cost performance baseline
    • 10. EEF
    • 11. OPA

    • Tools:
    • 1. Make-or-buy analysis
    • 2. Expert Judgment
    • 3. Contract types

    • Outputs:
    • 1. Procurement management plan
    • 2. Procurement statements of work
    • 3. Make-or-buy decisions
    • 4. procurement documents
    • 5. source selection criteria
    • 6. change requests
  49. Conduct procurements
    obtaining seller responses, selecting a seller and awarding a contract

    • Inputs:
    • 1. Project management plan
    • 2. Procurement documents
    • 3. Source selection criteria
    • 4. Qualified seller list
    • 5. Seller proposals
    • 6. Project documents
    • 7. Make-or-buy decisions
    • 8. Teaming agreements
    • 9. OPA

    • Tools:
    • 1. Bidder conferences
    • 2. Proposal evaluation techniques
    • 3. Independent estimates
    • 4. Expert Judgment
    • 5. Advertising
    • 6. Internet Search
    • 7. Procurement negotiations

    • Outputs:
    • 1. Selected sellers
    • 2. Procurement contract award
    • 3. Resource calendars
    • 4. Change requests
    • 5. Project management plan updates
    • 6. Project document updates
  50. Administer Procurements
    managing procurement relationships, monitoring contract performance, and making changes as needed

    • Inputs:
    • 1. Procurement documents
    • 2. Project management plan
    • 3. Contract
    • 4. Performance Reports
    • 5. Approved Change Requests
    • 6. Work Performance Information

    • Tools:
    • 1. Contract Change control system
    • 2. Procurement performance reviews
    • 3. Inspections and audits
    • 4. Performance reporting
    • 5. Payment systems
    • 6. Claims administration
    • 7. Records management system

    • Outputs:
    • 1. Procurement documentation
    • 2. OPA updates
    • 3. Change requests
    • 4. Project management plan updates
  51. Close procurements
    completing & settling each contract, including resolution of any open items

    • Inputs:
    • 1. Project management Plan
    • 2. Procurement documentation

    • Tools:
    • 1. Procurement audits
    • 2. Negotiated settlements
    • 3. Records management system

    • Outputs:
    • 1. Closed procurements
    • 2. OPA updates